Sunday, July 21, 2019

Fruit is Coming!


Normally by this time of the summer we are dragging hose and just trying to keep enough water on plants to keep them alive. But so far this year we've stayed wet enough to keep plants looking good and rain barrels in the greenhouse topped up. Growing degree days started accumulating late and despite some really warm temps over the past week, haven't really caught up too much. We're at 1842 since April 16 (average bud break). Also, climate change:


Despite two trips out of town, we largely stayed ahead of the beetle damage so far. We have veraison on Foch and Frontenac, but not Chambourcin:
 




Speaking of trips, we spent a few days at the Chalet. Bob and Sharon visited, and the weather and company was great.



Upon our return, we had water issues in the greenhouse. The point of failure with my demand pump is the pressure switch. The diagnosis was easy, as this has happened before. Feeling clever, I ordered not one, but three replacement switches. I didn't feel that clever when, after receiving my shipment, I found 2 more extra switches from my order the last time it failed. 


The GFCI outlet the pump uses also failed. In the process of fixing that, I fixed a stripped screw hole in the cover, making it watertight for the first time in a couple of years. The repairs were more satisfying that one would imagine.


This time of year lots of stuff fruits. Not only are grapes coming on, but we've finally got enough jaboticaba for a batch of wine. 




First time ever for a Second crop of Grumichama

Lemondrop Mangosteen

Dragonfruit
Not pictured are blackberries, because I'm embarrassed by the fact that the patch is completely overgrown. More pawpaws again this year, but I suspect it will be another month before they are ripe. 

Some of the Nortons are still struggling but we haven't lost any more vines. And in some really exciting news, we have about 5 of the cuttings take root.


Lisa and I had to work all week, but Allie and Joe were here and got some work done as well. We really enjoyed the visit, hope they did too!




Sunday, June 16, 2019

Struggling Norton, Father's Day Fishing

The Nortons are struggling a bit. Many to the south are weak and pale. Three have suddenly wilted and died. Right now I'm missing 9 of 44 vines. Many will not be strong enough to support grapes. Norton is notoriously hard to root, but I took a dozen cuttings from the stronger vines, trimmed them, dipped in rooting hormone, and potted them up.


Jake wanted to go fishing so we got permission from the neighbors across the road and headed out on Father's Day. The fish were biting.





We have our first meaningful jostaberry harvest. They could be sweeter and less sour. We'll freeze them for a Tutti Fruiti wine at some later time.



Callaway County sunset, by Jake
Clapp's Lake, circa 1997

20+ years later

Sunday, May 26, 2019

Staycation 2019

On short notice, Lisa went to Arizona to help her mom, leaving me at home alone for Staycation 2019. It's not fair to say she left me with a list, but let's say there were goals.

First up was the deck drain. I've been fooling with this for years, and my attempts to muscle it into place mainly resulted in breaking the plastic. Glenn's Pools had a 10' replacement piece, and with some table saw creativity, we have something that looks decent.



Next up, the leaking hot tub. I suppose at 16 years of age, things are bound to start going wrong with the hot tub. The store from which we purchased the tub is out of business, and Glenn's couldn't look at it for a month. So I consulted Dr. Google, and lo and behold, not only can you get a replacement for the leaking heating element for $160, but there are helpful videos online showing how to replace it. The only glitch was that the hole for the thermometer/thermistor was 1/32" too small. One trip to Lacrosse later, it was carefully drilled out and the fit was perfect.


I started work on the cart which will be the island counter in the poolhouse. You can't find 4x4 pine in Fulton, so I glued up 2x4 for the legs.


Lacrosse did have a pocket hole jig so that the screws will be hidden.


I tried a couple of different configurations for the shelves and wound up using a single shelf with one extra run of bracing. Hopefully it won't be in the way.



Stained the frame grey and the shelf a mix of black and grey (I thought black was too dark).


It still needs a couple of coats of poly, then we'll get it out to the poolhouse.

We've a beautiful crop of jabos on the younger tree. I'm hoping for a decent crop from the older tree as well, one which will finally yield a gallon of Pierce Estate Jaboticaba wine.


Sunday, May 5, 2019

Rain, Rain Go Away

Over the past week we received over 3 inches of rain. This is unfortunate for us because last weekend the mower broke down. We managed to get the backyard done but the largest part of the yard has not been cut for two weeks. The good news is that the skies cleared for the weekend, bringing sun and some temporary drying out of the yard for mowing today - just in time for another 3 inches in the coming week.

The gutter drain from the front of the house.
The concrete sink/countertops are installed in the poolhouse. Plumbing works. Softener installed. Bring on summer!


Last weekend we bottled about 5 cases of wine. The Grenache rosé looks good. The Frontenac rosé lost some color. Lack of tannins is suspected.  But it smells and tastes terrific. We benched trialed some blends of the Frontenac with Chardonel, and in the end we liked the different character of each wine, so they got bottled separately.

Frontenac rosé, Chardonel, Grenache rosé
Two weeks ago we replanted about 20 vines, mostly Vidal. Replanting wasn't has hard as digging out the old roots. Cooler temps seem to have slowed growth up to some degree, but we now have shoots 5-12" long.

Two weeks ago, after mowing and before all the rain
Shawn and Suzanne came over for some wine. We had an outstanding Arneis, a white grape from Piedmont. This bottle came from California, but it was delicious. We lit a fire and had S'mores. Shawn achieved the perfect toast. As it darkened we spotted the Space Station and, as a bonus, a beautiful blue-green meteor to the south.



We have a short 3 day work week next week, as we were previously scheduled to be off for a couple of days to work at home. I'll be watching the forecast.


Saturday, May 4, 2019

Spray Schedule 2019

Log of sprays for 2019

  • 4/22/2019 - Mancozeb
  • 5/4/2019 - Mancozeb + Quintec (quinoxyfen)
  • 5/18/2019 - Abound
  • 5/28/2019 - Mancozeb + Emerald (boscalid)
  • 6/4/2019 - Mancozeb + Quintec (quinoxyfen)
  • 6/13/2019 - First Cover - Abound (azoxystrobin)
  • 6/20/2019 - Second Cover - Mancozeb + Stature (dimethomorph) + Sevin (zeta-cypermethrin)
  • 7/1/2019 - Third Cover - Mancozeb + Quintec (quinoxyfen) + Sevin (zeta-cypermethrin)
  • 7/11/2019 - Captan + Emerald (boscalid) + Sevin (zeta-cypermethrin)
  • 7/23/2019 - Captan +  Quintec (quinoxyfen) + Sevin (zeta-cypermethrin)
  • 7/28/2019 - Immunox (Myclobutanil) + Malathion
  • 8/7/2019 - Abound

Sunday, April 14, 2019

Budbreak

Log of budbreak 2019

  • Frontenac 4/13
  • Foch 4/14
  • Vidal, Chambourcin, Traminette, Chardonel 4/17
  • Norton 4/18




Saturday, April 13, 2019

Bonus Day

The forecast for the second Saturday in April was for cool temperatures, so our expectations were low. We worked inside late morning, but when the sun came out, we took advantage of the unexpectedly favorable weather to get some things done outside.

The pool lounge chairs may be the death of me. Pedro in Coral Springs, FL insists they are properly sized but I have yet to get them installed. They seem to be 3/4" too narrow. I attempted for 2 hours to MacGyver a spreader out of one of my clamps with no success. Lisa put an end to my futility by just ordering one from Amazon.

We turned to the poolhouse, where we have yet to hook up the plumbing for the new sinks. Unfortunately the concrete is too thick for easy installation of the faucets. I trimmed down one of the plastic screws and with one more trip to Westlakes, we should finally have it done. In a last ditch effort to actually accomplish something - anything - I got the water on in the poolhouse. The welded water wrench performed flawlessly.


Dinner was a highlight. Lime jasmine rice, pan-seared garlic asparagus, and salmon with dill and apple chutney.


Rain (maybe snow) is forecast for the morning hours. More progress on the poolhouse seems unlikely until next weekend. Grapes ship Monday and the pool opens Wednesday, so we'll be very busy.